Contact Us

Phone
0412 991 464

Email
melbourneconcretecutting@gmail.com

Address
Lalor, Victoria, 3075

Online Enquiry

* Required fields

December 2018

Concrete Cutting Port Melbourne

Posted By ,
23/12/2018 21:20 PM
Melbourne concrete cutting completed floor sawing a series of trenches at Boeing in Port Melbourne over Saturday and Sunday whilst the production areas were shut down.

Concrete Cutting Bundoora

Posted By ,
12/12/2018 21:00 PM
Melbourne Concrete Cutting was engaged by Northside Christian College to cut out a trench to lay power cables. 

Concrete Cutting Whittlesea

Posted By ,
11/12/2018 20:32 PM
Concrete Cutting in Whittlesea for Yarra Valley Water

Concrete Cutting Tullamarine

Posted By ,
11/12/2018 20:18 PM
Concrete Cutting Tullamarine. Melbourne concrete cutting completed a full service of cut, remove and cart off site for an industrial warehouse in Tullamarine 

Core Drilling Melbourne

Posted By ,
11/12/2018 20:13 PM
Core Drilling through 600mm solid brick walls at RMIT City campus. 

Core Drilling Northcote

Posted By ,
11/12/2018 20:10 PM
Core Drilling under a footpath in High St Northcote onto a Telstra pit. Anthony drilling 800mm deep

Concrete Cutting Roadsaw

Posted By ,
11/12/2018 20:04 PM
Melbourne Concrete Cutting invest in the best equipment available.  We understand that reliability and experienced operators go hand in hand and we take concrete cutting seriously.

Concrete Cutting Yarraville

Posted By ,
11/12/2018 20:00 PM
Melbourne Concrete Cutting completed a major project for Nacap Australia. We cut up 4.2kms of road at 300mm depth to allow a new 14inch pipeline to be fitted underground to supply Melbourne Airport wi...

Concrete Cutting Northcote

Posted By ,
11/12/2018 19:58 PM
The Melbourne Concrete Cutting trailer parked in Northcote. This was for a job across the road from the Northcote Social Club where a new cafe was being opened “little local”. We cut up th...

Concrete Cutting Mernda

Posted By ,
11/12/2018 19:52 PM
Bitumen Cutting with our roadsaw to allow an extension to an existing road in Mernda. These works were completed with traffic control in place and using our water cart to supply water for this 300m st...